    • 1. The prefabricated bridge arrives at the park ready for installation..jpg
      The prefabricated bridge arrives at the park ready for installation.
    • 2. A crane lifts the bridge off the truck and to its installation spot..jpg
       A crane lifts the bridge off the truck and to its installation spot.
    • 3. The bridge fitting into position..jpg
      The bridge fitting into position.
    • 4. Bridge sits on concrete abutment with embedded helical piles..jpg
      Bridge sits on concrete abutment with embedded helical piles.
    • 5. Measurements of the bridge taken after the installation..jpg
      Measurements of the bridge taken after the installation.
    • 6. The first pedestrian walking across the newly installed bridge..jpg
      The first pedestrian walking across the newly installed bridge.

    Scurry to Skiffe's Creek, James City, VA

    Fender

    The surry to skiffs creek transmission line was constructed to bring cleaner electric service to the Virginia Peninsula by replacing coal-fired plants. For the high impact capacity fender system to the protect the towers, Dominion selected FiberPILE with its superior energy absorption and corrosion resistance.

     

    REQUEST A QUOTE
    Complete Project Summary >

    View a detailed summary including project features and dimensions.