Location: San Diego, CA

Project: US Navy Pier 12 Replacement

Product: Pipe Piles

Overview: For this pier replacement project, Creative Pultrusions supplied 230 SUPERPILES, ranging from 61 to 66 feet long and 12 inches in diameter. The piles included a 20-foot long HDPE sleeve to help withstand abrasion from marine camels. In addition, some of the piles at the end of the pier were filled with concrete by the contractor, in order to give them added stiffness, as desired by the project owner.